Completed |
Prepare documentation required for local authority building plan application submission
| Prepare an initial design concept and advise on:
i-the intended space provisions and planning relationships
ii-proposed materials and intended building services
iii-the technical and functional characteristics of the design
|
Develop all aspects of the design from concept to full development including, but not limited to, construction systems, materials, fittings, and finishes selections |
Prepare documentation required for local authority building plan application submission |
Prepare specifications for the works |
Administer the building contract |
Facilitate the project close-out including the collation of the necessary documentation to effect completion, handover and operational manual of the project |
Completed |
Determine the site and rights and constraints2
| Check for conformity of the concept with the rights to the use of the land |
Review the programme and budget with the client, principal consultant or other consultants |
Co-ordinate technical documentation with the consultants and complete primary co-ordination sufficient to support building plan submission |
Prepare specifications for the works |
Give possession of the site to the contractor |
When the contractor's obligations with respect to the building contract have been fulfilled, the architectural professional shall issue the certificates related to the contract completion |
Completed |
Determine budgetary constraints
| Consult with local and statutory authorities |
Coordinate other consultants designs into building design |
Review the costing and programme with the consultants |
Obtain offers for the execution of the works |
Issue construction documentation |
Provide the client with construction record documentation and the relevant technical and contractual undertakings by the contractor and sub-contractors |
Completed |
Determine the need for consultants
| Review the anticipated costs of the project |
Prepare design development drawings including drafting technical details and material specifications |
Obtain the client's authority, and submit documents for approval at the local authority |
Evaluate offers, and recommend a successful tenderer for appointment |
Review sub-contractor designs, shop drawings and documentation for conformity of design intent |
|
Completed |
Determine indicative project timelines |
Review the project programme |
Discuss and agree on the building plan application and approval requirements with the local authority |
|
Prepare the contract documentation and arrange the signing of the building contract by the client and the successful |
Inspect the works for conformity with the contract documentation and acceptable quality in terms of industry standards |
|
Completed |
Determine methods of contracting |
|
|
|
Complete all remaining technical and construction documentation and coordinate same with the consultants |
|
Administer and perform the duties and obligations assigned to the principal agent in the building contract |
Completed |
Whether other statutory authority applications are required or desirable |
|
|
|
|
Manage the completion process of the project |
|
Completed |
|
|
|
|
|
|
Assist the client to obtain the required documentation necessary for the client to obtain the occupation certificate |